Sealed bids will be received by the Director of Transportation at the office of the Alabama Department of Transportation, Montgomery, Alabama until 10:00 AM on January 30...
Sealed bids will be received by the Director of Transportation at the office of the Alabama Department of Transportation, Montgomery, Alabama until 10:00 AM on September 27, 2024 and at that time publicly opened for constructing the Vertical Realignment (Grading, Drainage, Pavement, Retaining Wall, Traffic Signs, and Traffic Stripe) on SR-74 (US-278) (Westbound Roadway under the Norfolk Southern Railway Overpass) from the junction of SR-13 to the junction of SR-5 in Natural Bridge.
Sealed bids will be received by the Director of Transportation at the office of the Alabama Department of Transportation, Montgomery, Alabama until 10:00 AM on September 27, 2024 and at that time publicly opened for constructing the Intersection Improvements (Grading, Drainage, Pavement, and Traffic Stripe) on SR-33 at CR-24 to include a Left Turn Lane Installation on CR-24 and extending the Right Turn Lane on SR-33 in Double Springs.
Sealed bids will be received by the Director of Transportation at the office of the Alabama Department of Transportation, Montgomery, Alabama until 10:00 AM on April 07, 2023 and at that time publicly opened for constructing the Left Turn Lane Installation (Grading, Drainage, Micro-Milling, Resurfacing, Traffic Signal Installation, and Traffic Stripe) on SR-195 at 20th Avenue in Haleyville. Length 0.139 mi...
Sealed bids will be received by the Director of Transportation at the office of the Alabama Department of Transportation, Montgomery, Alabama until 10:00 AM on April 29, 2022 and at that time publicly opened for constructing the Micro-Milling, Resurfacing (Scrub Seal), and Traffic Stripe on SR-13 from the junction of SR-129 to the Marion County Line (Site 1) and the Safety Widening, Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, and Traffic Stripe on SR-129 from the Marion County Line to the junction of SR-13 (Site 2).
Sealed bids will be received by the Director of Transportation at the office of the Alabama Department of Transportation, Montgomery, Alabama until 10:00 AM on August 27, 2021 and at that time publicly opened for constructing the Bridge Rehabilitation (Steel and Concrete Repairs, Steel Bridge Coating, Deck Sealing, and Decorative Lighting Removal) on SR-257 at the Duncan Bridge over Lewis Smith Lake north of Curry. Length 0.226 mi.
Sealed bids will be received by the Director of Transportation at the office of the Alabama Department of Transportation, Montgomery, Alabama until 10:00 AM on March 26, 2021 and at that time publicly opened for constructing the Resurfacing (Micro-Surfacing Seal Coat) and Traffic Stripe on CR-2 (Forest Highway 5) from the junction of SR-195 to the intersection of SR-33 north of Double Springs.
Sealed bids will be received by the Director of Transportation at the office of the Alabama Department of Transportation, Montgomery, Alabama until 10:00 AM on March 26, 2021 and at that time publicly opened for constructing the Roadway Safety Assessment Sites (Guardrail Installation) on SR-6, SR-13, SR-17, and SR-269 at various locations in the West Central Region as indicated in the plans.